Pavement and Bridge (PM2)
- Percent of Interstate pavements in Good condition
- Percent of Interstate pavements in Poor condition
- Percent of Non-Interstate National Highway System (NHS) pavements in Good condition
- Percent of Non-Interstate National Highway System (NHS) pavements in Poor condition
- Percent of NHS bridges by deck area classified as in Good condition
- Percent of NHS bridges by deck area classified as in Poor condition
Targets are established biennially for these measures as part of a four-year performance period, the second of which began in 2022. NCTCOG adopted 2024 and 2026 targets for these measures in July 2023. The Streamlined Project Delivery team coordinates this measure.
Committee Action and Targets
July 2023 RTC Action on Pavement and Bridge Condition Performance MeasuresDecember 2020 RTC Action on Pavement and Bridge Condition Performance Measures
November 2018 RTC Action on Pavement and Bridge Condition Performance Measures
Additional Information
FHWA Transportation Performance Management HomeFHWA Bridge Measures Fact Sheet
FHWA TPM Rulemakings (Links to final rules and measure fact sheets)
FHWA TPM Guidance (Procedures and guidance for calculating measures and setting targets)
TxDOT Initial Transportation Asset Management Plan
Measures in the Code of Federal Regulations (CFR):
- Pavement Measures: 23 CFR 490 Subpart C (§490.301-§490.319)
- Bridge Measures: 23 CFR 490 Subpart D (§490.401-§490.413)
Staff Contacts
Pavement/Bridge Measures: Jody LozaGeneral Federal Performance Measure Coordination: Chris Klaus, Jenny Narvaez, and James McLane